Be wary of phishing or scam attempts. URA will NOT ask for sensitive personal information relating to your accounts, such as your Singpass ID/password or your banking ID/password. As a safeguard, all official SMSes sent by URA will not carry clickable links. Use our feedback form to report any suspicious SMSes supposedly from URA. Stay vigilant and safe! Learn how to spot these scams.

Submission of Walking and Cycling Plan for Selected Commercial, Retail, Business Park and School Developments

  Published: 03 May 2016
Circular No : LTA/R70.018.001; URA/PB/2016/08-DCG
Our Ref : LTA/DBC/D45.002.001; DC/ADMIN/CIRCULAR/PB_16

CIRCULAR TO PROFESSIONAL INSTITUTES

Who Should Know:
Building owners, developers, architects, engineers and traffic consultants

Effective Date:
01 July 2016

  1. As part of the Walk Cycle Ride SG vision, we aim to make walking, cycling, and riding public transport the way of life for Singaporeans and a means of enhancing liveability in Singapore. To help realise this vision, developers will be required to submit a Walking and Cycling Plan (WCP) as part of the Development Applications for commercial, retail, business park and school developments that reach a specific development quantum. These are developments with expected high pedestrian and cyclist traffic.
  2. The WCP has to be submitted to the Land Transport Authority (LTA) and the Urban Redevelopment Authority (URA) for evaluation and approval. As part of the WCP, developers will need to consider the safety, convenience and accessibility for pedestrians and cyclists in the design of the development. Requiring the WCP at an early stage will also reduce the need for plans to be adjusted later in the development process to accommodate such needs.

Walking and Cycling Plan

  1. The WCP should consider carefully pedestrians and cyclists’ needs, and incorporate the following elements:
    1. Facilitate convenient and direct pedestrian and cyclist access from nearby public transport facilities and adjacent developments, by providing covered paths and crossings (be they at-grade, underground, or elevated)1 where appropriate. These should also take into consideration existing or upcoming cycling paths in the area;
    2. Minimise conflict between pedestrians, cyclists and motor vehicles at locations such as vehicular ingress/egress, car park entrances, and drop-off points and taxi stands. Suitable measures such as signages or traffic calming features should also be considered;
    3. Provide sufficient and conveniently located bicycle parking spaces and supporting amenities for cyclists such as shower rooms and lockers;
    4. Provide easy-to-understand wayfinding signage giving directions to key public transport facilities, pedestrian and cycling facilities as well as key amenities nearby; and
    5. Design accesses and routes that are barrier-free and thoughtful for safe and comfortable passage for children, elderly and the mobility-challenged group.

Implementation

  1. The WCP leverages on the existing Traffic Impact Assessment (TIA) process. Before submitting the Development Application to URA, the appointed traffic consultant and the Qualified Personnel (Architect) of the project should work together in preparing the WCP as part of the TIA scoping process, and submit the WCP to LTA. LTA and URA will jointly scrutinise the WCP together with the QP to ensure that the intentions of the plan are achieved. The QP should then revise the WCP based on LTA’s and URA’s comments, and incorporate the revised WCP in the Development Application to URA. This pre-submission consultation approach to the WCP will ensure that the processing timeline for Development Applications is not adversely affected. Please refer to Annex A for the WCP submission flowchart.
  2. Commercial developments, retail developments, business park developments and schools as identified in Table 1 below, will be required to submit the WCP. The WCP requirement may be extended to other development types in the future.

Table 1: Development Types that require WCP as part of TIA

Development Type   Scale
Retail developments
(i.e. Shopping centres)
>= 10,000m2 GFA
Commercial developments
(i.e. Offices)
>= 20,000m2 GFA
Business Parks >= 40,000m2 GFA
Schools  
- Primary ≥1,500 students (single-session),
≥2,000 students (double-session)
- Secondary, International & Junior College ≥2,000 students
- ITE campus, Polytechnic, University Required

  1. The WCP requirement will take effect on 1 July 2016. Developers submitting new applications (i.e. applications for a new erection or major additions and alterations) on or after this date, for the development types listed in Table 1, will be required to submit a WCP. The WCP will not be required for development applications that have been granted Provisional Permission or which have obtained LTA’s clearance for the TIA by 1 July 2016.
  2. LTA has updated the Code of Practice (COP) to guide submission requirements for the WCP. Please refer to http://www.lta.gov.sg/content/dam/ltaweb/corp/Industry/files/COP-Appendices/RT-COP-V1.2.pdf to download the latest COP. Please submit the WCP as part of the TIA pre-scoping consultation with LTA (via lta-dbc_registry@lta.gov.sg) before submitting a development application to URA. See Annex A for submission flowchart.
  3. We would appreciate it if you could convey the contents of this circular to the relevant members of your organisation. If you or your members have any queries concerning this circular, please email us at lta-dbc_registry@lta.gov.sg and Email (or call the URA Development Control Group Enquiry Line at Tel: 6223 4811).
Thank You.

LINA LIM
GROUP DIRECTOR (POLICY & PLANNING)
for CHIEF EXECUTIVE
LAND TRANSPORT AUTHORITY


HAN YONG HOE
GROUP DIRECTOR (DEVELOPMENT CONTROL)
for CHIEF EXECUTIVE OFFICER
URBAN REDEVELOPMENT AUTHORITY

_____________

1 This should include providing interim linkages during the construction phase of the development, e.g. where existing footpaths / linkways are to be removed upon hoarding of the site.