Queensway Node
Discover plans for Queensway Node under the Master Plan 2025, including new homes, jobs, parks and better links to nearby hubs.
URA and the Singapore Institute of Architects (SIA) launched a design competition in September 2024. Architects were invited to form multi-disciplinary teams and submit design proposals for the Queensway node that demonstrate the following attributes for the site:
A distinctive and one-of-a-kind destination space
Potential to generate a strong sense of community ownership and pride
Welcoming, safe and accessible for users from all walks of life
Sensitively consider the surrounding context (i.e. Rail Corridor and the surrounding residential estates).
URA received submissions from a total of 20 multi-disciplinary teams, which were assessed based on their concept and vision, uniqueness of place-making characteristics, inclusivity, feasibility and safety.
About Queensway Node


Queensway node is in the heart of Queenstown, surrounded by Tanglin Halt, Mei Chin, and Queensway estates. The site includes a large and covered space beneath the Queensway Flyover, with the Rail Corridor trail running through the site.
Queensway node consists of three key areas:
A. An elevated earth mound west of the trail, which opens into an expansive, sheltered space under the viaduct structure.
B. The Rail Corridor trail and the sloping sides along it.
C. An open space at the interface between the Rail Corridor, surrounding access points, and the future residential developments.
Public Engagement

URA engaged residents in 2024 on what they would like to see at the node. Residents shared the following with us:
Design Outcomes – Safe, Accessible, Vibrant
Facilities & Amenities – Lighting, Barrier-free ramps, Multi-functional spaces
Activities – Picnics, Movie screenings, Community performances
Together, with the feedback received, the following vision for the node was crafted:
"A well-loved community node, with programmable and multi-functional spaces”
Winning Entries
First place

Designshop Pte Ltd, HKS Asia Pacific Design Consulting Pte Ltd, Taylor Thomson Whitting (SG) Pte Ltd, DN+O Engineers LLP, DLS Consultancy Pte Ltd
Kaleidoscope Boh Beh Kang [PDF, 4.90 MB]
Second place

MODE Architects Pte Ltd, VEngineers, Hitech Engineering, NG 3 Consultants Pte Ltd
Undercover Spaces: A Secret Beneath [PDF, 11.45 MB]
What's Next?
The winning team will be appointed by URA to further develop the design proposal with agencies and stakeholders such as residents, and complete implementation of the node by 2027.
Other ways to share feedback
Share your feedback on the winning entry for Queensway node and sign up for upcoming engagement sessions here!

