76 Guan Chuan Street
Secondary Settlement Guidelines
Tiong Bahru Conservation Area
Historic address: 76 Guan Chuan Street

Guidelines and Procedures
All proposed works will need to comply with the Conservation Guidelines and the Specific Restoration Guidelines (SRG). Conservation Permission is required before all additions & alteration works and operations of new use can begin.
Residential Fronts are characterised by timber casement windows flanking a double-leafed timber door. All buildings with residential front which is existing and/or identified in the 'Specific Restoration Guidelines', regardless of land use zoning, shall be retained and restored.
Please refer to the Tiong Bahru: Do-It-Right Guide for guidance on works to conserved Tiong Bahru pre-war units. Owners are required to apply to HDB for a renovation permit and to seek clearance from URA for works affecting the main building façade.
Gallery

Explore Street View
The building can be found at this street.

