Skip to main content
A Singapore Government Agency Website How to identify
Official website links end with .gov.sg
Government agencies communicate via .gov.sg websites (e.g. go.gov.sg/open). Trusted websites
Secure websites use HTTPS
Look for a lock () or https:// as an added precaution. Share sensitive information only on official, secure websites.

Welcome to our refreshed website!

Urban Redevelopment Authority (URA)

Envelope Control Guidelines

Check the envelope control guidelines for bungalows (or detached houses).

Last updated 7 June 2026
Isometric drawing showing building envelope with setbacks and road buffer of a house.

Envelope Control Guidelines

Building Height

Technical drawing showing the maximum heights of a 2-story building with attic, including lift overrun and safety barrier.

2-storey Envelope Control landed housing

Diagram of a building showing height restrictions. Text labels indicate measurements and features like "Attic", "Road", and "lift overrun."

3-storey Envelope Control landed housing

Chart showing data in boxes overlaid on dashed trendlines. The top box has a green cap.

Envelope Control for sloping sites (section)


Mezzanine Floors

Diagram of housing form showing the permissible building envelope. It includes height and angle limitations.

Guidelines for Mezzanine Floor

Attics

Diagram showing permissible building heights and roof terrace placement for landed housing. Includes annotations for specific height restrictions.

Attic Guidelines

Basements

Basements in Low-lying Areas

Diagram illustrating maximum building height measured from Minimum Platform Level (MPL), showing basement, ground level, and allowable height limit.

Basement guidelines for low-lying sites

Basements on Sloping Sites

Diagram showing building height restrictions from road to front, with labelled dimensions and setbacks.

Basement on Sloping Sites